Sediment Removal from Feeding Tunnel of Integrative Basin

Sediment Removal from Feeding Tunnel of Integrative Basin

The works for the removal of sediments inside the tunnels connecting the Biffis canal to the integrative basin of the Bussolengo hydroelectric plant have been completed. The intervention was carried out by a team of divers and the remote-controlled DRF 80 dredger,...