Sediment Removal from the Bottom Outlet of the Pavana Dam (PT)
Started in November 2022, dredging work is still ongoing at the Pavana Dam, aiming to remove 6,700 m³ of sediment to restore the functionality of the bottom outlet. The characteristics of the material to be removed (gravelly sand) required the use of a suction-return...
Dredging of the Vizze Dam
Dredging work is currently underway at the Vizze Dam, involving the removal of approximately 3,000 m³ of sediment, with the material being returned to the nearby disposal basin constructed with sheet piles....