Dredging of the Vizze Dam

Dredging of the Vizze Dam

Dredging work is currently underway at the Vizze Dam, involving the removal of approximately 3,000 mĀ³ of sediment, with the material being returned to the nearby disposal basin constructed with sheet piles....
Sediment Removal from Feeding Tunnel of Integrative Basin

Sediment Removal from Feeding Tunnel of Integrative Basin

The works for the removal of sediments inside the tunnels connecting the Biffis canal to the integrative basin of the Bussolengo hydroelectric plant have been completed. The intervention was carried out by a team of divers and the remote-controlled DRF 80 dredger,...

Dredging of Curon Basin

Dredging of the Curon Melago basin for Alperia Greenpower S.r.l. using the remote-controlled DRP60 dredger equipped with an EL60HC pump, fully powered by the GP145-T generator.