The works for the removal of sediments inside the tunnels connecting the Biffis canal to the integrative basin of the Bussolengo hydroelectric plant have been completed. The intervention was carried out by a team of divers and the remote-controlled DRF 80 dredger,...
The works to restore the functionality of the bottom outlet of the Val Schener Dam have been completed with the removal of 18,000 m³ of sediment. The works allowed the clearing of the bottom outlet entrance up to a depth of 52 meters. The removed material was flushed...
As part of the dredging works of the Crispi Basin No. 3, along with the resurfacing of the outer mantle of the industrial quay at the Port of Palermo, the production of SubMac weighted filter mattresses has commenced. .
Dredging of the Curon Melago basin for Alperia Greenpower S.r.l. using the remote-controlled DRP60 dredger equipped with an EL60HC pump, fully powered by the GP145-T generator.
114 bituminous SARMAC mattresses, measuring 9.0×2.0×0.2 m, were delivered as part of the Tortue project in Dakar, Senegal, to form an underwater platform for loading large crates for oil platform installations onto a cargo ship.